CASE STUDIES
Filter:
Sort by:
Underside of Heli-deck
Cape were struggling to achieve the correct temperature specification to allow work to commence on the underside of the platform Heli-deck.
Read More
GDF SUEz E&P Nederland B.V. Spot repair in Potwatertank
GDF had a task to blast and paint the potwatertank. This involved steam cleaning the tank, get heat into the tank so it dried quickly then start blasting.
Read More
Replacing lagging on Vacuum Tower
PetroIneos had a very tight schedule to complete this task as HSE were stopping people from going in the tower until Temporary Lighting was fixed. Originally, they had planned to use fixed Lighting
Read More
Provide power supply to the Solan
Bi-Fab had the task of painting the legs for the Solan platform. They needed lighting and ventilation inside the tubes so EX power was needed. They had a shortage of power supply around the area so they needed to bring in a system. SA supplied the SA POWERNET ATEX MDU (Mains Distribution Unit) and also Transformers.
Read More
WATER INJECTION PUMP MOTOR
Challenges: On the Gryphon Alpha, the water injection pump had been redundant for a few months. When needed to be re-instated, the DC motor was damp. They considered sending the motor back to the beach which would have taken several weeks and wasted thousands of pounds to re-build. Solution: The SA FLEXIHEAT ATEX Heater was […]
Read More
Extracting fumes out of a small, tight confined space in the air handling units.
Challenges: Wood Group had a big project of welding and painting in small compartments of the ship. This meant that the fumes had to be extracted to achieve a workable environment. Solution: Extracted the fumes out of a 9 story high shim and in the air handling units, by linking SA CYCLONE Air Mover 40cm […]
Read More
Mitigating risks during Bonded Warehouse maintenance work
Challenges Within the brewing and distilling industry, in spirit handling areas and pumps rooms etc. The use of efficient ventilation is crucial to remove vapours at low points in work areas. These precautions will positively impact the working environment, reducing the risk of secondary explosion hazards. A distillery operator was completing maintenance work in their […]
Read More
SA Equip offers cost-effective EX Power and Lighting Equipment in Morecambe Bay to Extend the life of Rhyl Field
Challenges ATEX certified products were required as the platform was still processing gas. Limited capacity on board led to the necessity for portable power solutions. Spirit Energy were looking to reduce costs and extend the life of the Rhyl Field, SA Equip products were selected for use on the Normally Unmanned Installation enabling effective power distribution and cost-savings. […]
Read More